| |  |

--
 GENERAL VALLEY NEWS | |  TRAFFIC TO BE AFFECTED ON I-5 AT EBBEY SLOUGH BRIDGE August 21, 2010

 (MONROE, WA) -- The state department of transportation (WSDOT) advises that traffic at I-5 and the Ebey Slough bridge will be affected next week and the following week due to bridge repairs that will be underway.
Below is the schedule of lane closures:
· Sunday, Aug. 22 - morning of Friday, Aug. 27 - Up to two lanes of southbound I-5 will close nightly starting at 8 p.m. near the SR 528/SR 529 interchange in Marysville for bridge joint repair. All lanes will reopen by 5 a.m.
· Sunday, Aug. 22 - morning of Friday, Aug. 27 - The off-ramp from southbound I-5 to SR 529 may close nightly from 8 p.m. to 5 a.m. in conjunction with bridge joint repair on I-5. Drivers will follow a signed detour route.
· Sunday, Aug. 22 - morning of Friday, Aug. 27 - The on-ramp from SR 528 to southbound I-5 may close nightly from 10:30 p.m. to 4 a.m. in conjunction with bridge joint repair on I-5. Drivers will follow a signed detour route.
· Sunday, Aug. 29 - morning of Friday, Sept. 3 - Up to two lanes of southbound I-5 will close nightly starting at 8 p.m. near the SR 528/SR 529 interchange in Marysville for bridge joint repair. All lanes will reopen by 5 a.m.
· Sunday, Aug. 29 - morning of Friday, Sept. 3 - The off-ramp from southbound I-5 to SR 529 may close nightly from 8 p.m. to 5 a.m. in conjunction with bridge joint repair on I-5. Drivers will follow a signed detour route.
· Sunday, Aug. 29 - morning of Friday, Sept. 3 - The on-ramp from SR 528 to southbound I-5 may close nightly from 10:30 p.m. to 4 a.m. in conjunction with bridge joint repair on I-5. Drivers will follow a signed detour route



 | |
|
 BACK TO
 HOME

| | 



 |