X
 
 
 
 
 
 
 Home Page   My Sky Valley   Advertising   Contact Us   Privacy Policy   About Us   Terms of Use 
Register Here
Welcome

Log In
https://www.aspca.org/sites/default/files/pets-in-hot-cars.pdf
http://www.hellothaifood.com/benjarong/index.html

Wed, August 23, 2017

"The #1 Read & Rated Sky Valley News Source
& Only Daily Paper in the Sky Valley!"
http://www.gregorbooks.com/cgi-bin/gregor/index.html



RSS Feeds
Everett, WATemp: 57°FSky: overcastForecast...
SECTIONS
BREAKING NEWS
FEATURE NEWS
SNOHOMISH
MONROE
SULTAN
STARTUP
BARING
GOLD BAR
INDEX
SKYKOMISH
STEVENS PASS
GENERAL
VALLEY NEWS
OPINION &
EDITORIAL
VIDEOS
LEGAL NOTICES
CLASSIFIEDS
AUCTIONS
http://www.skyvalleychronicle.com/?template=advertising_rates

--

BREAKING NEWS

OUTSOURCED SUPPLY CHAIN BLAMED FOR 787 DREAMLINER PROBLEMS
February 04, 2013




Boeing 787 Dreamliner built for All Nippon Airways. Photo: All Nippon Airways.
(SEATTLE, WA) -- Boeing company engineers are blaming the current problems that have grounded the company's new 787 Dreamliner fleet on an outsourced supply chain that resulted in “poor quality components” that came from subcontractors that operated largely out of Boeing’s view, according to a report in The Seattle Times.

The report quotes unidentified engineers as the basis of the report.

In citing “engineers with knowledge of the situation,” the report says:

~ Boeing’s 787 Dreamliner has suffered “numerous electrical system flaws beyond the battery problems” that led to its current grounding.

~ The risk to the company is not the battery, according to one 787 electrical engineer, the real problem is “the power panels.”

~ The same engineer says unlike earlier Boeing jets, the guts of the 787 power distribution panels, which control the flow of electricity to the plane’s critical system, are “like Radio Shack,” with parts that are “cheap, plastic and prone to failure.”

~ Another engineer says there’s a preponderance of “electrical faults” with the new 787’s.

~ And yet another engineer, one not directly involved with the 787 said he believes the company’s early “delegation of control on 787 outsourcing to multiple tiers of suppliers” is now coming back to bite the company with all these new problems.

The Dreamliner fleet is grounded indefinitely due a battery fire on a 787 in Boston and a battery fire on a 787 flight in Japan a week later.

The Times report can be found here





BACK TO

HOME

http://www.skyvalleychronicle.com/DONATE/DONATE-TO-THE-SKY-VALLEY-CHRONICLE-214446
More Headlines

BREAKING NEWS
Snohomish, WA business charged by state with
tax theft
Highline Medical Center Agrees to Settle Civil Rights Claims
Seattle Police officers sue city councilwoman for alleged defamation over comments made about police shooting in 2016
Injured Climber Rescued From Ledge at Wallace Falls In Snohomish County
Deputies investigate reported sexual assault not far from Snohomish High School

    More->

http://www.murphyauctions.net/mailing.html

http://skyvalleychronicle.com/


© 2008-2017 Sky Valley Media Group, LLC
www.skyvalleychronicle.com is owned and produced by
Sky Valley Media Group, LLC which is solely responsible for its content