X
 
 
 
 
 
 
 Home Page   My Sky Valley   Advertising   Contact Us   Privacy Policy   About Us   Terms of Use 
Register Here
Welcome

Log In
http://benjarongmonroe.com/menu/

Mon, June 18, 2018

"The #1 Read & Rated Sky Valley News Source
& Only Daily Paper in the Sky Valley!"

http://benjarongmonroe.com/menu/


RSS Feeds
Everett, WATemp: 57°FSky: overcastForecast...
SECTIONS
BREAKING NEWS
FEATURE NEWS
SNOHOMISH
MONROE
SULTAN
STARTUP
BARING
GOLD BAR
INDEX
SKYKOMISH
STEVENS PASS
GENERAL
VALLEY NEWS
OPINION &
EDITORIAL
VIDEOS
LEGAL NOTICES
CLASSIFIEDS
AUCTIONS
http://www.skyvalleychronicle.com/?template=advertising_rates

--
SNOHOMISH  WEATHER
Temperature: 54.3°F / 12.4°C | Humidity: 97% | Pressure: 29.94in / 1014hPa (Rising) | Conditions: Clear | Wind Direction: SSE | Wind Speed: 0mph / 0.0km/h
SNOHOMISH

Application filed for large senior
housing project
Plans call for 5-story, 100 unit building, parking for over 100 vehicles

February 23, 2018




CLICK TO ENLARGE
(SNOHOMISH, WA.) – The City of Snohomish has received an application for a large, new senior multi-family housing development on Weaver Road.

The applicant is proposing 100 units, located in a single, five-story building with a basement, according to an informational statement from the city.

Parking for 121 vehicles is proposed, as well as utility improvements, curbs, gutters, and sidewalks, street trees, and wetland mitigation work south of the proposed building. 

The property is zoned Business Park (BP). In the BP zone multi-family developments are allowed with a conditional use permit, but only if “in conjunction with commercial use on the same site”.  

The applicant for this project (Gordon Cole, on behalf of Snohomish Business Park LLC) is the owner/developer of the Snohomish Business Park site, which is immediately adjacent to the parcel where the senior housing project is proposed.  

As the business park and the proposed senior housing project are both located on the same 18-acre site (made up of parcels under common ownership) the “in conjunction” requirement is met.

The BP zone allows for taller buildings than in other parts of town

The base allowance is 45 feet, with a setback incentive: for each foot the building is set back from the property line, an additional one foot of height is allowed.  The proposed building is 59 feet tall, because it is set back 15 feet from the property line.

A dedicated project web page has been set up here for the project. More information, including submittal documents and plans, has been posted to this site for the public to view. As more information is added to the record, the city will post it to that page.

This project will require a public hearing before the City’s hearing examiner.  The hearing has not yet been scheduled as the project is still in the preliminary review phase.  

Interested parties are encouraged to provide written comments for the record (all comments will be forwarded to the Hearing Examiner for consideration), and/or attend the hearing when it is scheduled.





BACK TO

HOME

http://www.skyvalleychronicle.com/DONATE/DONATE-TO-THE-SKY-VALLEY-CHRONICLE-214446
More Headlines

SNOHOMISH
Closure of Westbound Hwy 2 lanes scheduled for this weekend is canceled
Weekend closures of westbound lanes of Highway 2 set to begin
REVISED DATES
Hwy 2 repaving between I-5 interchange & Bickford Ave. in Snohomish
Changes, lane closures
Lane closures, detours this
coming week
Due to SR 2
repaving project
Human remains found near SR 522 in Snohomish

    <-Previous    More->

http://skyvalleychronicle.com/




© 2008-2018 Sky Valley Media Group, LLC
www.skyvalleychronicle.com is owned and produced by
Sky Valley Media Group, LLC which is solely responsible for its content